Case Study Atlanta, GA
From Full Replacement → Full Recovery

Severely saturated EPDM roof system with thousands of gallons of trapped water

Project Overview
-
Roof Type: Mechanically Attached EPDM over Gravel B.U.R.
-
Condition: End of Life
-
Moisture Level: Severe Saturation
-
Outcome: Restored (No Tear-Off)

The Situation
This roof had reached the end of its service life.
-
Multiple seam failures
-
Tears across the field of the roof
-
Water actively entering the building
-
Thousands of gallons trapped inside the system
Replacement seemed like the only option.

THE CHALLENGE
-
Active leaks needed to be stopped immediately
-
Moisture was widespread and trapped
-
Owner could not justify full tear-off
-
Business operations had to continue
The roof wasn’t just wet — it was failing.

What Was Done
1. Stop the Damage
-
Sealed seams and penetrations
-
Made system watertight
2. Install Venting System
-
Custom RS-1 & RS-2 layout
-
Based on infrared data
3. Monitor + Adjust
-
Ongoing tracking of dry-down
-
Vent adjustments for performance

Not a patch. An engineered system to reverse the condition.

The Results
Wet → Dry progression over time

February (Wet)

May (Improving)

October (Dry)
The Outcome
-
95% reduction in wet areas
-
Fully dried in under 8 months
-
$1.2M+ saved
-
Zero disruption to operations
A roof that should have been replaced… was restored.